Swire Coca-Cola manufacturing facility
$475 millionUnder wayUnder construction
A 620,000-square-foot bottling and production facility at Peak Innovation Park near Colorado Springs Airport, pursuing LEED Gold and expected to create 170 jobs.
Beverage production space carries large process mechanical, refrigeration and electrical scopes, plus truck courts and parking that need paving now and seal-and-stripe maintenance later.
HVACelectricalpavingfire protectionroofing
Colorado Springs Gazette, 2026-03-27 (opens in a new tab)→UCHealth Memorial Hospital North expansion
$407 millionSee sourceConstruction beginning 2026
An expansion that will nearly double Memorial Hospital North on Briargate Parkway in northern Colorado Springs, adding surgical capacity and an expanded cancer center.
Patient tower construction starting in 2026 means multi-year mechanical, electrical and fire protection work, followed by flooring and painting before patient opening.
HVACelectricalfire protectionflooringpainting
SoCo Digest, 2025-03-12 (opens in a new tab)→Palmer High School Phase 1A rebuild
$100 millionUnder wayUnder construction
Colorado Springs District 11 is demolishing and rebuilding Palmer High School's academic wing and renovating its 1939 building downtown, with the new wing opening February 2027 and the 1939 building and courtyard finishing March 2028.
Two openings in 2027 and 2028 stage mechanical and electrical work first and then flooring, painting and courtyard landscaping, inside a historic building that needs careful finish work.
HVACelectricalflooringpaintinglandscaping
Colorado Springs Gazette, 2026-07-30 (opens in a new tab)→Colorado Springs temple of The Church of Jesus Christ of Latter-day Saints
Under wayBroke ground September 2026
A 33,000-square-foot temple plus a separate meetinghouse and maintenance building on an 18.6-acre site at Flying Horse Club Drive and Barossa Valley Road in northeast Colorado Springs, on a three-to-four-year build.
The general contractor is from Utah, so local mechanical, electrical, paving and landscaping subcontracts are the opening, and an 18.6-acre grounds site needs long-term landscape maintenance.
HVACelectricalpavinglandscaping
Colorado Springs Gazette, 2026-09-06 (opens in a new tab)→Children's Hospital Colorado, Golisano Children's Hospital, Colorado Springs expansion
$40 million giftAnnounced or plannedExpansion announced September 2026
A major expansion of the seven-year-old Children's Hospital Colorado campus in the Briargate neighborhood of Colorado Springs, funded by a $40 million Golisano Children's Alliance gift, adding inpatient beds and surgical capacity, a larger emergency department and improvements to outpatient buildings such as the behavioral health center.
Added beds, operating rooms and a bigger emergency department mean construction and fire sprinkler and alarm work in an occupied hospital, then flooring, painting and clinical cleaning as each area opens.
constructionfire protectionflooringpaintingcleaning
Colorado Springs Gazette, 2026-09-10 (opens in a new tab)→Douglass Valley pre-K-8 school replacement, U.S. Air Force Academy
$42.7 millionUnder wayBroke ground August 2026
A new pre-K through eighth grade school for Academy School District 20 on the U.S. Air Force Academy, funded by a Department of Defense grant, replacing Douglass Valley Elementary, the district's oldest school.
A new school building on base runs through general construction, fire sprinkler and alarm systems, then flooring and paint before the school opens to pre-K through eighth grade students.
constructionfire protectionflooringpainting
KOAA News 5, 2026-08-03 (opens in a new tab)→ElevateCOS concourse modernization, Colorado Springs Airport
$63 millionSee sourceConcourse work complete August 2026; food court, elevators, check-in carpet and ticket counters expected summer 2027
A concourse modernization at Colorado Springs Airport that widened gates, raised ceilings and added terrazzo flooring, new carpet, electrochromic windows, family restrooms and care rooms, with a reimagined food court and check-in upgrades still to come.
The remaining package includes new carpet at check-in, a rebuilt food court and new ticket counters, and the larger concourse with new restrooms and terrazzo floors adds to the airport's daily cleaning and floor-care load.
flooringcleaningconstruction
5280, 2026-08-26 (opens in a new tab)→Space Force Operations Facility, Schriever Space Force Base
$250 millionUnder wayAnnounced May 2026; construction start not yet set
A Defense Department operations facility at Schriever Space Force Base east of Colorado Springs, one of four planned nationally, expected to support 2,500 civilian jobs and missions including Golden Dome and space-based reconnaissance.
An operations building of this size carries heavy power, cooling and fire suppression scopes, and a facility staffed by thousands of civilians needs long-term janitorial contracts once it opens.
constructionelectricalHVACfire protectioncleaning
Colorado Public Radio, 2026-06-01 (opens in a new tab)→Aberdeen Ridge senior living campus
235 unitsOpening or openFully open 2026; assisted living and memory care opened spring 2026
A 15-acre campus atop Fillmore hill on the west side of Colorado Springs with 171 independent-living apartments, 40 assisted-living units and 24 memory-care suites, plus a clubhouse with an indoor pool, spa, fitness center and five dining areas.
A fully occupied senior campus with a pool, spa and five dining areas needs daily cleaning support, fire sprinkler and alarm inspections across every building, and grounds maintenance on 15 acres.
cleaningfire protectionlandscaping
Colorado Springs Gazette, 2026-06-02 (opens in a new tab)→Palmer High School Phase 1A
$100 millionUnder wayUnder construction
Colorado Springs School District 11 is replacing Palmer High School's academic wing, renovating the 1939 building and adding a courtyard in downtown Colorado Springs, with part of Boulder Street permanently vacated to unite the campus.
The new academic wing opens in February 2027 and the 1939 building and courtyard in March 2028, so roofing, envelope, mechanical and electrical trades work the downtown campus into 2028.
roofingconstructionHVACelectrical
Colorado Springs Gazette, 2026-07-30 (opens in a new tab)→