All articles, page 2
Page 2 of 29, newest first.
The warranty covers the part. The building pays the labor, the diagnostic call and the refrigerant. Four questions that reopen the call.
The seven sections of a one-page commercial roof report, and the one most roofers skip that makes the rest of the page believable.
The front desk blocks pitches and routes reasons. The plumbing openings that get through, including the compliance one almost nobody uses.
A photo proves the problem exists. Three lines under it tell the facility manager what it violates, what the fix costs, and who has to sign.
Ten things to look at on a commercial lot, what each finding means, and how to rank them as safety, structural or cosmetic so they get funded.
Material costs the same for everyone. The labor column you pick, the supervision line nobody adds, and the exclusions page are where the money is won.
Ask when the current contract renews, offer a walkthrough instead of a price, then workload the building so the number is a floor and not a guess.
Structure decides who carries the risk of a mild winter. How seasonal, per push and hybrid snow contracts differ, and the five clauses that matter.
The walk is not the deliverable. The five fields that belong on a one-page HVAC walkthrough summary, a copy-ready template, and why a range beats a price.
The walkthrough that might land a replacement can land a maintenance agreement today. What goes in it, and why the manufacturer guarantee helps you.
A commercial solar proposal is read by someone who never saw the roof. What belongs on page one, and why the five percent safe harbor no longer applies.
A commercial landscaping bid request is not the scope. The four questions that surface drainage, irrigation and tree work before you price it.
“We already have an IT guy” is usually true. Four questions that keep the door open, and what in-house IT rarely covers.
Eighty hours of an estimator dialing produces a handful of walkthroughs. The same hours walking lots produce thirty written ranges.
The four-box prep card a security integrator fills in before dialing a property manager: the map, the tenants and age, the name, and one thing to raise.
A facility manager sorts an HVAC cold call into vendor or useful in about thirty seconds. What belongs in the first three sentences, and when to stop talking.
A six-line commercial roofing cold call script, with the reason each line is there. Free script for calling property managers while the capital plan is open.
Referrals arrive after the grounds budget is already approved. How to build a budget list of fifteen properties and be the number in the capital plan instead.
Painting work enters a capital plan long before it becomes a bid request. The sequence, the fiscal-year question, and the four-question call.
The managed services proposal that wins was shaped months earlier, by a range given while the budget was still open.
Asking if there is work coming up makes the facility manager do your qualifying. Ask about something that already exists in the building instead.
Gatekeepers screen for pitches, not for you. How to state the reason for your call so it gets routed to the facility manager.
A commercial cleaning bid sent a year out from renewal sets a ceiling you cannot undo. What to leave after the walkthrough instead, and when the bid belongs.
Which twenty buildings are worth a walkthrough. Score on equipment age, building type, ownership and visible need, using real ASHRAE service life data.
