How to Find Painting Jobs to Bid On Before the Bid Request

Commercial painting contractor walking a building exterior with a property manager during a fall walkthrough

Most commercial painters find out about a job when the bid request arrives. By then the scope is written, the budget is fixed, and the only variable left is price.

A painting contractor walks a property and hands the property manager a range for the exterior repaint. That’s the work most contractors think of as the job, and it’s done. The number goes into the budget, the plan leaves the property manager’s hands, and it sits with ownership while nobody tells anybody anything.

This is where most contractors go quiet. They wait to be told. The work gets approved or quietly cut in a meeting they were never going to be invited to, and a long time later a request either arrives or it doesn’t, with no explanation attached to either outcome. Then they call it a slow year.

One call, made at the right point in that sequence, tells you which it was and why.

In short

  • Painting work enters a budget long before it becomes a bid request. The contractor who was there first shapes the scope.
  • Ask which fiscal year the property runs on. That one answer tells you when every other step happens.
  • Call after the plan goes to ownership and before the money is assigned. Four questions, ten minutes, no pitch.

The sequence, not the calendar

Every commercial property runs the same five-step sequence for capital work. What changes between properties is when it starts, and that depends entirely on the fiscal year, which is why a contractor working off their own calendar is guessing.

Stage What the property manager is doing Where you should be
1. Assessment Walking the property, listing what is failing On the walk. Ask for it before anybody asks you
2. Costing Putting a number beside each item Your range becomes that number
3. Submission Sending the plan up to ownership The call. Four questions
4. The cut Ownership funds some items and removes others You learn whether yours survived, and why
5. Release Money assigned, scope written, request issued You have known about it for months

A contractor who finds the job at stage five is competing on price against everyone else who found it at stage five, which is a race decided by who is most willing to be wrong about the building. A contractor who was there at stage one wrote the description the request is based on.

Find out which fiscal year the property runs on

This is the single question that converts the sequence above into dates you can put in a calendar, and almost nobody asks it.

Plenty of owners run a calendar fiscal year. Plenty of institutional owners, universities and public bodies run July to June, which shifts the entire sequence by six months. Some corporate owners run something else again. Guess wrong and you make your call a quarter after the decision was already taken.

“Quick question so I’m not bothering you at the wrong time. What fiscal year does the property run on, and roughly when does the budget go up for approval?”

Nobody is annoyed by that question. It’s administrative, easy to answer, and it quietly signals that you understand capital spending runs on a process and not on a mood.

The call, and the four questions

Make it once the plan has gone to ownership and before the money is assigned. That’s the one window where a property manager knows exactly what they asked for and what is at risk, and hasn’t yet been handed the decision, which makes them unusually willing to talk about it. Call earlier and there’s nothing to discuss. Call later and it’s settled.

Open by saying you’re not chasing anything.

“I’m not calling to sell you anything. I know the plan went up. I wanted to ask four quick questions so I know whether to keep this on my radar.”

01

Did the painting line make the plan?

A yes or no. If no, you stop spending time on it and you know a year early instead of finding out through silence.

02

Did the number hold?

If it was trimmed, the scope will be trimmed too, and you would rather help shape that than discover it in a request.

03

What else went up with it?

You learn what your line is competing against inside the same building, and sometimes you learn about work nobody has called anybody about yet.

04

When do you expect to hear?

Gives you the date for the next call, offered by them, which means the follow-up is expected instead of intrusive.

Ten minutes. No pitch anywhere in it. You now know more about the funding status of that building than any contractor who will eventually bid against you, and you knew it months before the request went out.

Be there at stage one

Abstrakt sets appointments with the property managers, facility managers, and owners who build budgets, so your estimators are walking buildings before the requests go out. The walk, the number, the proposal, and the contract are yours.

Book a Strategy Call

Why the early contractor is hard to beat

Being early gets described as an advantage of timing. It’s really an advantage of authorship, and the difference matters because timing can be matched by anybody with a calendar while authorship can’t be matched at all.

The contractor who walked the building wrote the description of the problem. Their range became the budget figure. When the scope is finally written, it’s written from their observations, in their words, around the preparation and the systems they specified. Everybody else is pricing that document.

This matters more in painting than in most trades, because the spread between a good bid and a cheap one is almost entirely preparation, and preparation is the part a written scope either protects or leaves open. A scope that names the surface preparation, the number of coats and the film build is a scope a serious contractor can win. A scope that says repaint the building is an invitation for somebody to spray over failing substrate and be gone.

If you’re at stage one, write the preparation into the description you leave behind. It’s the most valuable sentence on the page.

Name the preparation standard, by number

There’s a way to make that sentence unarguable, and most commercial painters never use it, which is strange given that it costs nothing and takes about six words.

Surface preparation has published standards with numbers attached, and they’re not obscure. The Department of Defense specifies painting work for its own buildings through UFGS 09 90 00, Paints and Coatings, produced jointly by the Army Corps of Engineers, Naval Facilities Engineering Command, the Air Force and NASA. It calls up preparation by designation, the same way a structural drawing calls up a steel grade.

Designation Official title In plain terms
SSPC SP 1 Solvent Cleaning Get the oil and grease off before anything else
SSPC SP 2 Hand Tool Cleaning Scrapers and wire brushes, loose material only
SSPC SP 3 Power Tool Cleaning Powered tools, still not down to bare metal
SSPC SP 6 / NACE No. 3 Commercial Blast Cleaning Abrasive blast, limited staining permitted
SSPC SP 11 Power Tool Cleaning to Bare Metal Bare metal without blasting, useful on occupied sites
SSPC SP 13 / NACE No. 6 Surface Preparation of Concrete The one that applies to most commercial exteriors

Write one of those into the description you leave behind and the scope stops being a matter of opinion. A competitor who intends to pressure wash and spray is now visibly bidding something different from what the property asked for, and the property manager can see it without knowing anything about coatings.

The same specification also references AMPP QP 9, the Standard Procedure for Evaluating the Qualifications of Commercial Painting and Coating Contractors. If your company holds that qualification, it belongs on the page. If it doesn’t, knowing it exists is still worth something, because it tells you what a sophisticated owner may eventually ask for.

Staying first without becoming a nuisance

The failure mode is checking in. Nobody wants a call that exists to remind them you’re alive.

Every contact needs a reason that belongs to them. The date they gave you. A photograph of a condition that has changed since you walked it. A material lead time that affects when they would need to commit. Each of those is information. “Just following up” isn’t.

Two or three contacts across a planning cycle, each carrying something useful, is a relationship. The same number of empty check-ins is a nuisance, and the difference is entirely in what you bring.

Where to start

List the properties you walked in the last year. Every one of them has a budget and you’re already in it, or should be. That list is more valuable than a prospecting list.

Call each one and ask the fiscal year question. One sentence, no pitch. Write the answer next to the property.

Put the four questions on a card. Did it make the plan, did the number hold, what else went up, when will you hear.

Put the date they give you in your calendar. Then call on it, because you said you would, and that’s most of the reason they will take it.

Frequently Asked Questions

How do you find painting jobs before they’re advertised?

Get into the budget conversation instead of waiting at the end of it. Walk properties before anyone asks, give a range that becomes the budget figure, then call once the plan has gone to ownership to find out whether it survived. By the time a request is issued, the scope is already written and the only remaining variable is price.

What is the one question that tells you when to call?

Which fiscal year the property runs on. Calendar-year owners run the whole sequence six months apart from July-to-June owners, so a contractor working from their own calendar is guessing. It’s an administrative question and property managers answer it without hesitation.

What do you ask on the call?

Whether the painting line made the plan, whether the number held, what else went up alongside it, and when they expect to hear. Four questions. Ten minutes. No pitch anywhere in it, and the last one hands you the date for your next call, offered by them instead of asked for by you.

Why does being early matter so much in painting?

Because the gap between a good bid and a cheap one is preparation, and preparation only survives if it’s written into the scope. The contractor who was there first writes that description. Everyone else prices it.

How often should you follow up without annoying anyone?

Two or three times across a planning cycle, and every contact must carry something the property manager can use: a date they gave you, a changed condition, a lead time that affects their decision. Contact with information is a relationship. Contact without it’s a nuisance.

What if the painting line was cut?

You have learned it directly instead of inferring it from silence, and you have learned why. Ask what would have to change for it to survive next cycle, note the answer, and keep the property on the list. Work that was cut once is usually work that comes back.

Keep going

About this article

Jeff Winters is Chief Executive Officer at Abstrakt. Reviewed by Neil Erker, Chief Marketing Officer. Abstrakt sets appointments for commercial painting contractors and the rest of the trades, and the questions here come from that calling.

Chief Executive Officer at  – [email protected]

Jeff Winters is the CEO of Abstrakt Marketing Group, a U.S.-based B2B lead generation and appointment-setting company that books qualified sales meetings for clients across the commercial trades, IT and managed services, manufacturing, and B2B services. He has spent his career building and running outbound sales programs at scale, and he breaks down what actually works in sales and lead generation on Abstrakt's podcast, The Grow Show.

Stream Our Podcast

Share This Post

More Like This

What a Facility Manager Actually Does With the Panel Photo You Send

The Question That Gets a Commercial Plumbing Contractor Past the Front Desk

A commercial paving contractor inspecting the condition of a parking lot surface

The Parking Lot Maintenance Checklist That Belongs in a Budget